Progress Ireland

Tunnel-and-Towns Model Anatomy

The architectural choices behind the rail-led Dublin model, from the one question it asks down to the source of every input. Open a section to go one level deeper.

Numbers: model v5.7 · basis v5 decided (6 Oct 2026), ventilation shafts back (14 Oct 2026), Navan forecast not grown twice (20 Oct 2026), no urban road tunnels, land on a matched premium and the Codex fixes, 150 km of new motorway for Road Towns, congestion at €0.25 a car-km, the tunnel’s fleet on one through-running service and a third Codex review’s fixes (22 Oct 2026), Rail Towns fills its trains and runs 10-car trains (23 Oct 2026), riders on both networks, congested minutes, the full 10-car step and the Northern works (23 Oct 2026), 25 towns at once with the build-out to 2055 (24 Oct 2026)Every figure on this page is read from the model at build time592 sections, none over 500 wordsPage built 28 October 2026
NamesRoad Towns = the model's Option 1 (committed rail, then roads)Rail Towns = Option 2 (the rail ladder and the towns that fill its trains)Bundle 6 = Option 3 (Road Towns plus the NTA's 2018 no-tunnel package, v4.1)
Status lettersP published figure (cited)D derived by arithmetic from published figuresC convention (a reasonable modelling standard, not a measurement)A ASSUMPTION: no direct source; a sensitivity is run where it mattersU unverified placeholder

What the model is, and how to read this page

One question, two cities, three linked pieces of arithmetic.

Progress Ireland's tunnel-and-towns model asks one question. If the Dublin region has to house a fixed number of extra homes by 2050, is a rail-led city cheaper to serve with infrastructure, and worth more, than a roads-led one? The model builds both cities on the same housing total and compares them. Nothing in it claims that a railway creates homes.

The Road Towns option builds the railway that is already committed (DART+, FourNorth, MetroLink and, since v3.9, the Navan Railway), fills it, and serves every other home with roads, parking and utilities as a car suburb. The Rail Towns option adds a ladder of rail investment on top: the through-running tunnel from Heuston to the Docklands, four-tracking to Naas, more throughput on the Northern line, electrified extensions, new stations and twenty greenfield rail towns of 15,000 homes each. Whatever still does not fit on rail is a car-suburb home, exactly as in the Road Towns option.

Three pieces of arithmetic do the work.

  • The capital model turns train seats into homes, fills those homes in a fixed order, and prices what the remaining car-suburb homes cost to serve.
  • The demand engine lets behaviour respond to the quality of the railway: a town on a terminating, low-frequency line generates fewer rail trips, more car trips and a lower density than one on a through-running network.
  • The cost–benefit analysis values the Rail Towns option minus the Road Towns option under the Department of Public Expenditure's appraisal conventions.

This page's numbers are model v5.7, read from the model at build time. Central case for Dublin, Meath and Kildare: 264,000 more homes rail-served by 2050 under Rail Towns than under Road Towns, with room for 321,000 more once the works operate; the State's transport bill €31.4bn against €23.5bn, so Road Towns €7.9bn cheaper; all modelled infrastructure €50.7bn against €48.4bn; net present value €9.1bn on transport benefits and €9.1bn with land use. The Low scenario deepens the state-transport gap, and every quotation of the central case has to say so. Since v3.12 replacement and vacancy homes no longer load the network, which removes the state-transport saving the v3.9 page reported; the rail-led city's case now rests on parking, utilities and the CBA's benefits.

How to read this page. Each section below opens with a click. Every section, at every level, stays under 500 words; longer topics are cut into smaller sections. The lowest level is the register of inputs: each one shows its Low, Central and High values, its status letter (P published, D derived, C convention, A assumption, U unverified), the source it rests on, what it drives, how it was tested and what evidence would replace it. The model, the honesty ledger and the register text quoted at the lowest level call the two futures Option 1 (Road Towns) and Option 2 (Rail Towns).

490 words.